It is located on the right bank of the Sava River, 50 kilometers west from Belgrade and 17 kilometers upstream from TENT A complex. It has two largest power units in Serbia, with power of 620 megawatts each, which have been operational since 1983, i.e. 1985, respectively.

The first studies on the selection of location and construction were prepared in 1972-1974. The decision on realization was adopted by the Joint Electric Power Company “Beograd” in early 1975, and funds for the construction were secured in 1976. This was followed by designing and supply of equipment for the first two unit's. Construction works began in the spring of 1978, mounting of steel structure of the first unit began a year later, and for the second unit in 1982. For that time, this was a fantastic venture by European standards.

In its work up to date, TENT B has set almost all records in production, duration of continuous work, hourly use, main indicators of efficiency and cost-efficiency of exploitation.